Panama Chitré Los Santos Santa-Ana y Playa El Rompio

Villas 16 to 19
Construction page 6
Page
1
10 Jean-François pictures, owner of the 16
Villas 8 to 15
Page
1
Villas 1 to 7
Page
1
Villas 30 to 39
Page
1
Pouring cement for water tank
Preparing the 2nd storey
Preparing the 2nd storey
Our beach
Beach, fisherman, and a few tourists
The end of the structure and getting ready to pour the cement
Cement pouring
With the cement hose
Leveling
Finishing
one side finished
the 4 villas are ready for the second floor
Preparing second floor
Pouring the stairs
Stairs finished
Arch interior M
Arch interior M
Entrance M
beginning window detail
from the patio B
Kitchen